Citation: | ZHONG Fuhai, HE Shuhua, GAO Fei, FEI Zhongming, LIU Zhentong, WANG Fuchang, ZHU He. Well Cementing Technology for Well Yangtan-1 with High Circulation Pressure[J]. DRILLING FLUID & COMPLETION FLUID, 2015, 32(5): 98-100. doi: 10.3969/j.issn.1001-5620.2015.05.024 |
黎亮.小井眼窄间隙尾管固井工艺[J].西部探矿工程, 2009, 21(11):81-83. Li Liang. The slim hole and narrow gap of liner cementing techniques[J].West-China Exploration Engineering, 2009, 21(11):81-83.
|
钟福海,刘硕琼,徐明,等.苏桥深潜山枯竭油气藏储气库固井技术[J].钻井液与完井液, 2014, 31(1):64-67. Zhong Fuhai, Liu Shuoqiong, Xv Ming, et al. Research and application on gas storage facility cementing technology of deep buried hill deplete zones in Suqiao[J].Drilling Fluid & Completion Fluid, 2014, 31(1):64-67.
|
钟福海,孙万兴,钟德华,等.中古514井超长封固段固井技术[J].钻井液与完井液, 2013, 30(3):64-66. Zhong Fuhai, Sun Wanxing, Zhong Dehua, et al. Cementing technology of cementing section of Well Zhonggu514[J].Drilling Fluid & Completion Fluid, 2013, 30(3):64-66.
|
张红卫.塔河油田盐下井AT9井复合尾管固井技术[J].钻井液与完井液, 2009, 26(4):43-45. Zhang Hongwei.Composite liner cementing technology in subsalt Well AT9 in Block Tabe[J].Drilling Fluid & Completion Fluid, 2009, 26(4):43-45.
|
刘振通,宋元洪,吴洪波,等.特殊注水泥作业"插旗杆"事故案例分析与思考[J].钻井液与完井液, 2011, 28(6):81-83. Liu Zhentong, Song Yuanhong, Wu Hongbo, et al.Analysis on trouble of pipe stuck while cementing in special cementing job[J].Drilling Fluid & Completion Fluid, 2011, 28(6):81-83.
|
钟福海,宋元洪,费中明,等.缅甸D区块窄密度窗口防漏防窜固井技术探讨[J].钻井液与完井液,2010,27(5):61-64. Zhong Fuhai, Song Yuanhong, Fei Zhongming, et al. Cementing technology on prevention of leaking and channeling with narrow density window in block D in burma[J].Drilling Fluid & Completion Fluid, 2010, 27(5):61-64.
|
范先祥,钟福海,宋振泽,等.楚28平1井固井技术[J].钻井液与完井液, 2005, 22(2):62-64. Fan Xianxiang, Zhong Fuhai, Song Zhenze, et al. Cementing technology in horizontal well Chu28 H-1[J]. Drilling Fluid & Completion Fluid, 2005, 22(2):62-64.
|
钟福海,钟德华.苏桥深潜山储气库固井难点及对策[J].石油钻采工艺, 2012, 34(5):118-121. Zhong Fuhai, Zhong Dehua.Cementing difficulties and countermeasures of deep buried gas storage in Suqiao area[J]. Oil Drilling & Production Technology, 2012, 34(5):118-121.
|
刘振通,吴洪波,宋元洪,等. Thingadong-1复杂高压气井大尺寸套管固井技术[J].钻井液与完井液, 2011, 28(4):57-59. Liu Zhentong,Wu Hongbo,Song Yuanhong,et al.Cementing technology in large casings of hign pressure gas well Thingadong-1[J].Drilling Fluid & Completion Fluid, 2011, 28(4):57-59.
|