Volume 40 Issue 3
May  2023
Turn off MathJax
Article Contents
FEI Zhongming, LIU Xin, ZHANG Ye, et al.Liner cementing through precise pressure control in the ultra-deep well Tian-X located at the southern margin of the Junggar basin[J]. Drilling Fluid & Completion Fluid,2023, 40(3):391-396 doi: 10.12358/j.issn.1001-5620.2023.03.016
Citation: FEI Zhongming, LIU Xin, ZHANG Ye, et al.Liner cementing through precise pressure control in the ultra-deep well Tian-X located at the southern margin of the Junggar basin[J]. Drilling Fluid & Completion Fluid,2023, 40(3):391-396 doi: 10.12358/j.issn.1001-5620.2023.03.016

Liner Cementing through Precise Pressure Control in the Ultra-Deep Well Tian-X Located at the Southern Margin of the Junggar Basin

doi: 10.12358/j.issn.1001-5620.2023.03.016
  • Received Date: 2023-01-05
  • Rev Recd Date: 2023-02-28
  • Available Online: 2023-07-21
  • Publish Date: 2023-05-30
  • The well Tian-X is an exploratory well located at the Anjihai anticline (an anticline in the Huomatu anticline zone) in the south edge thrust belt in the Junggar Basin. The 6th interval (Ф139.7 mm) penetrates a long open hole section of the well with coexistence of high and low pressure zones and narrow annular clearance, and the sandstone reservoir is developed with abundant pores and has active oil and gas. The safe drilling window in this interval is only 0.02 g/cm3, and mud losses have frequently happened during drilling. Narrow safe drilling window also causes difficulties in dynamically balancing the formation pressures and problems such as well kick and mud losses during casing running are quite prone to happen, resulting in poor cementing quality. To solve these problems, precise pressure management during casing running has been performed. Using the precise pressure management equipment, pressures at the wellhead during casing running and well cementing can be precisely controlled an the pressures at the points of mud losses an points of well kicks along the borehole were controlled in the scope of the safe window, thereby realizing pressure balance inside the wellbore. In cementing the liner string, the wellhead pressure was precisely controlled and the cement slurry returned to the designed depth in one circulation, and the cementing techniques were designed specifically to suit for the wellbore conditions. The well cementing job was performed successfully. IBC well logging interpretation shows that the job quality of the cementing section is 100% qualified, no gas channeling occurred at the bell nipple when mud density was reduced. This technology has provided a precious experience and reference significance for cementing wells with narrow drilling windows at the south edge of the Junggar Basin.

     

  • loading
  • [1]
    郭继刚. 精细动态控压固井技术在顺南区块的应用[J]. 钻井液与完井液,2016,33(5):76-79.

    GUO Jigang. Application of fine dynamic pressure control cementing technology in Shunnan block[J]. Drilling Fluid & Completion Fluid, 2016, 33(5):76-79.
    [2]
    王小文,张维滨,郑会锴,等. 控压固井技术简介[J]. 西部探矿工程,2019(1):37-40.

    WANG Xiaowen, ZHANG Weibin, ZHENG Huikai, et al. Introduction to pressure control cementing technology[J]. Western Exploration Engineering, 2019(1):37-40.
    [3]
    周英操,刘伟. PCDS精细控压钻井技术新进展[J]. 石油钻探技术,2019,47(3):68-74.

    ZHOU Yingcao, LIU Wei. New progress on PCDS precise pressure management drilling technology[J]. Petroleum Drilling Techniques, 2019, 47(3):68-74.
    [4]
    王果. 基于三级反馈调节的控压钻井回压自动调控方法[J]. 石油钻采工艺,2019,41(4):441-447.

    WANG Guo. Automatic backpressure control techniques of MPD drilling based on three-layer feedback regulation method[J]. Oil Drilling & Production Technology, 2019, 41(4):441-447.
    [5]
    刘伟,周英操,石希天,等. 塔里木油田库车山前超高压盐水层精细控压钻井技术[J]. 石油钻探技术,2020,48(2):23-28.

    LIU Wei, ZHOU Yingcao, SHI Xitian, et al. Precise managed pressure drilling technology for ultra-high pressure brine layer in the Kuqa Piedmont of the Tarim Oilfield[J]. Petroleum Drilling Techniques, 2020, 48(2):23-28.
    [6]
    石希天,肖铁,徐金凤,等. 精细控压钻井技术在塔中地区的应用及评价[J]. 钻采工艺,2010,33(5):32-34.

    SHI Xitian, XIAO Tie, XU Jinfeng, et al. Application and evaluation of fine pressure controlled drilling technology in Tazhong area[J]. Drilling & Production Technology, 2010, 33(5):32-34.
    [7]
    王敬朋,张伟,吴继伟,等. 呼探1井Ф139.7 mm尾管精细动态控压固井技术[J]. 石油钻探技术,2022,50(6):92-97. doi: 10.11911/syztjs.2022021

    WANG Jingpeng, ZHANG Wei, WU Jiwei, et al. Precise dynamic managed-pressure cementing technologies for Ф139.7 mm liner cementing in Well Hutan-1[J]. Petroleum Drilling Techniques, 2022, 50(6):92-97. doi: 10.11911/syztjs.2022021
    [8]
    晏凌,吴会胜,晏琰. 精细控压钻井技术在喷漏同存复杂井中的应用[J]. 天然气工业,2015,35(2):59-63. doi: 10.3787/j.issn.1000-0976.2015.02.009

    YAN Ling, WU Huisheng, YAN Yan. Application of fine pressure-controlled drilling technology in the construction of complex wells with leaks[J]. Natural Gas Industry, 2015, 35(2):59-63. doi: 10.3787/j.issn.1000-0976.2015.02.009
    [9]
    刘洋,陈敏,吴朗,等. 四川盆地窄密度窗口超深井控压固井工艺[J]. 钻井液与完井液,2020,37(2):214-220. doi: 10.3969/j.issn.1001-5620.2020.02.014

    LIU Yang, CHEN Min, WU Lang, et al. Managed pressure well cementing techniques for wells with narrow safe drilling windows in Sichuan basin[J]. Drilling Fluid & Completion Fluid, 2020, 37(2):214-220. doi: 10.3969/j.issn.1001-5620.2020.02.014
    [10]
    陈永衡,冯少波,邓强,等. 大北 X 井盐膏层尾管精细控压固井技术[J]. 钻井液与完井液,2020,37(4):521-525.

    CHEN Yongheng, FENG Shaobo, DENG Qiang, et al. Cementing liner string through salt formation in well Dabei-X by precise pressure control[J]. Drilling Fluid & Completion Fluid, 2020, 37(4):521-525.
    [11]
    于长明. 精细控压压力平衡法固井技术的应用实践[J]. 中国石油和化工标准与质量,2018,38(12):165-166. doi: 10.3969/j.issn.1673-4076.2018.12.078

    YU Changming. Application practice of fine control pressure balance method cementing technology[J]. Petroleum and Chemical Industry Standards and Quality, 2018, 38(12):165-166. doi: 10.3969/j.issn.1673-4076.2018.12.078
    [12]
    石林,杨雄文,周英操,等. 国产精细控压钻井装备在塔里木盆地的应用[J]. 天然气工业,2012,32(8):6-10. doi: 10.3787/j.issn.1000-0976.2012.08.002

    SHI Lin, YANG Xiongwen, ZHOU Yingcao, et al. Application of China-made precise managed pressure drilling equipment in the Tarim Basin[J]. Natural Gas Industry, 2012, 32(8):6-10. doi: 10.3787/j.issn.1000-0976.2012.08.002
    [13]
    左星,肖润德,梁伟,等. 精细控压钻井技术在高石19井实践与认识[J]. 钻采工艺,2014,37(6):9-10. doi: 10.3969/J.ISSN.1006-768X.2014.06.03

    ZUO Xing, XIAO Ruide, LIANG Wei, et al. Practice of precise managed pressure drilling technology in well GS19[J]. Drilling & Production Technology, 2014, 37(6):9-10. doi: 10.3969/J.ISSN.1006-768X.2014.06.03
    [14]
    赵德,赵维青,卢先刚,等. 西非S 深水区块裂缝性碳酸盐岩地层控压钻井技术[J]. 石油钻采工艺,2022,44(1):20-25.

    ZHAO De, ZHAO Weiqing, LU Xiangang, et al. Managed pressure drilling technology for fractured carbonate formation in deep water Block S, West Africa[J]. Oil Drilling & Production Technology, 2022, 44(1):20-25.
    [15]
    孙海芳,冯京海,朱宽亮,等. 川庆精细控压钻井技术在 NP23-P2009 井的应用研究[J]. 钻采工艺,2012,35(3):1-4.

    SUN Haifang, FENG Jinghai, ZHU Kuanliang, et al. Application of fine managed pressure drilling(MPD) technology developed by CCDC in well NP23-P2009[J]. Drilling & Production Technology, 2012, 35(3):1-4.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(2)  / Tables(3)

    Article Metrics

    Article views (698) PDF downloads(70) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return