[1] |
徐同台, 刘玉杰, 申威, 等. 钻井工程防漏堵漏技术[M]. 北京:石油工业出版社, 1997:69-71. XU Tongtai, LIU Yujie, SHEN Wei, et al. Lost circulation prevention and plugging technology in drilling engineering[M]. Beijing:Petroleum Industry Press, 1997:69-71.
|
[2] |
王君国. DS-2型堵漏材料实验装置[J]. 探矿工程, 1983(4):58-59. WANG Junguo. DS-2plugging material test device[J]. Exploration Engineering, 1983(4):58-59.
|
[3] |
杨天成, 高强. DLY-160堵漏模拟实验装置及应用[J]. 钻采工艺, 1993, 16(2):76-79.YANG Tiancheng, GAO Qiang. Dly-160 leak blocking simulation test device and its application[J].Drilling & Production Technology, 1993, 16(2):76-79.
|
[4] |
郭宝利, 袁孟雷, 孟尚志, 等. 一种新型堵漏模拟装置[J]. 钻井液与完井液, 2003, 20(4):47-49.GUO Baoli, YUAN Menglei, MENG Shangzhi, et al. A novel lost circulation simulator[J]. Drilling Fluid & Completion Fluid, 2003, 20(4):47-49.
|
[5] |
胡三清. JLX-2动态堵漏实验仪的研制[J]. 石油机械, 2000, 28(6):13-15.HU Sanqing. Model JLX-2 dynamic loss plugging tester[J]. China Petroleum Machinery, 2000, 28(6):13-15.
|
[6] |
王德玉, 蒲晓林, 施太和, 等. DL-1型堵漏实验装置及评价方法[J]. 石油钻采工艺, 1996, 18(5):44-48.WANG Deyu, PU Xiaolin, SHI Taihe, et al. Introduction and evaluation of mode DL-1 device for lost circulation control[J]. Oil Drilling & Production Technology, 1996, 18(5):44-48.
|
[7] |
杨争, 谭敏. DL-2H堵漏仪自动控制设计与应用[J]. 复杂油气藏, 2010, 3(3):84-86.YANG Zheng, TAN Ming. Design of automatic control for DL-2Hlost circulation evaluation device and its application[J]. Complex Hydrocarbon Reservoirs, 2010, 3(3):84-86.
|
[8] |
刘振东. 钻井漏失层位测量及堵漏模拟研究[J]. 钻探工程(探矿工程-岩土钻掘工程), 2015, 42(8):13-16. LIU Zhendong. Stimulation of drilling leakage zone measurement and plugging[J]. Drilling Engineering (Exploration Engineering-Rock & Soil Drilling and Tuneling), 2015, 42(8):13-16.
|
[9] |
余维初, 苏长明, 鄢捷年. 高温高压动态堵漏评价系统[J]. 钻井液与完井液, 2009, 26(1):20-22.YU Weichu, SU Changming, YAN Jienian. HTHP dynamic system for lost circulation evaluation[J]. Drilling Fluid & Completion Fluid, 2009, 26(1):20-22.
|
[10] |
郭宝利, 袁孟雷. 钻井堵漏模拟实验装置:ZL 02243296.5[P]. 2002-07-23. GUO Baoli, YUAN Menglei. Drilling plugging simulation test device:ZL 02243296.5[P]. 2002-07-23.
|
[11] |
冯学荣. 组合型裂缝漏床及其模拟堵漏实验方法的探索[J]. 钻采工艺, 2004, 27(6):14-18.FENG Xuerong. Combined fracture model & the methods of its simulation sealing experiment[J]. Drilling & Production Technology, 2004, 27(6):14-18.
|
[12] |
窦斌, 舒尚文, 郭建华, 等. 高保真模拟漏失地层堵漏评价实验装置设计[J]. 石油机械, 2009, 37(11):5-7.DOU Bin, SHU Shangwen, GUO Jianhua, et al. Test device of hi-fi simulation thief formation for leakage plugging evaluation[J]. China Petroleum Machinery, 2009, 37(11):5-7.
|
[13] |
蒋振新, 孟胡, 熊超, 等. 模拟环空流动状态的堵漏实验装置设计[J]. 石油机械, 2019, 47(9):44-49.JIANG Zhenxin, MENG Hu, XIONG Chao, et al. Design of lost circulation control test device simulating annulus flow[J]. China Petroleum Machinery, 2019, 47(9):44-49.
|
[14] |
刘人. 袖珍仿真堵漏实验装置[J]. 钻采工艺, 1995, 18(1):110. LIU Ren. Pocket simulation plugging test device[J]. Drilling & Production Technology, 1995, 18(1):110.
|
[15] |
段明祥, 张献丰, 张全明, 等. 钻井液用BDY-1便携式堵漏仪[J]. 钻井液与完井液, 2002, 19(2):30-32.DUAN Mingxiang, ZHANG Xianfeng, ZHANG Quanming, et al. A portable lost circulation evaluation device BDY-1[J]. Drilling Fluid & Completion Fluid, 2002, 19(2):30-32.
|
[16] |
杨振杰, 张玉强, 吴伟, 等. XAD-D新型堵漏评价实验仪研究与应用[J]. 钻井液与完井液, 2010, 27(1):44-46.YANG Zhenjie, ZHANG Yuqiang, WU Wei, et al. Study and application of the model XAN-D lost circulation tester[J]. Drilling Fluid & Completion Fluid, 2010, 27(1):44-46.
|