Citation: | YANG Yuhao, Wang Chenglong, HAN Cheng, WU Jiang, LI Wentuo, ZHANG Wandong. Running Suspended Cement Plug to Temporarily Isolate Reservoir in an Offshore HTHP Horizontal Gas Well[J]. DRILLING FLUID & COMPLETION FLUID, 2020, 37(3): 345-350. doi: 10.3969/j.issn.1001-5620.2020.03.013 |
[1] |
ERIK B NELSON, DOMINIQUE GUILLOT. Well cementing(Second edition)[M].Texas, USA:Schlumberger Educatiaon Service, 2006:503-548.
|
[2] |
刘崇建, 黄柏宗, 徐同台, 等. 油气井注水泥理论与应用[M]. 北京:石油工业出版社, 2001:451-455. LIU Chongjian, HUANG Baizong, XU Tongtai, et al. Theory and application of well cementing[M].Beijing:Petroleum Industry Press, 2001:451
-455.
|
[3] |
张明昌. 固井工艺技术[M]. 北京:中国石化出版社, 2007. ZHANG Mingchang. Cementing technology[M]. Beijing:Sinopec Press, 2007.
|
[4] |
李祝军, 韩成, 魏安超, 等. 海上超高温高压探井弃井水泥塞技术[J]. 钻井液与完井液, 2019, 36(5):617-621.
LI Zhujun, HAN Cheng, WEI Anchao, et al. The technology of setting cement plug for offshore ultra high temperature and ultra high pressure abandoned wells[J]. Drilling Fluid & Completion Fluid, 2019, 36(5):617-621.
|
[5] |
张超. 塔北地区高温高压井注水泥塞技术研究[J]. 油气井测试, 2016, 25(4):61-63.
ZHANG Chao. Research of cementing plug technology to high temperature and high pressure well at northern Tarim region[J]. Well Testing, 2016, 25(4):61-63.
|
[6] |
王兴武, 王时成, 马小龙, 等. 超深井注水泥塞技术[J]. 钻采工艺, 2012, 35(4):32-34.
WANG Xingwu, WANG Shicheng, MA Xiaolong, et al. Cementing plug technique in ultra-deep well of western region[J]. Drilling and Production Technology, 2012, 35(4):32-34.
|
[7] |
杨振杰, 岳砚华, 张建卿, 等. 注水泥堵漏过程中水泥塞形成高度及质量控制技术研究[J]. 天然气工业, 2005, 25(6):49-51.
YANG Zhenjie, YUE Yanhua, ZHANG Jianqing, et al. Techniques of controlling the formation height and quality of cement plug in the process of loss circulation control by cementin[J]. Natural Gas Industry, 2005, 25(6):49-51.
|
[8] |
顾军, 李士超, 田亚芳, 等. 水平井固井一界面泥膜分布规律及其特性[J]. 天然气工业, 2019, 39(8):88-95.
GU Jun, LI Shichao, TIAN Yafang, et al. Distribution laws and characteristics of mud films at casing-cement interfaces in Horizontal wells[J]. Natural Gas Industry, 2019, 39(8):88-95.
|
[9] |
FOSSO WAMBA S, TINA M, FRIGAARD I A, et al. Viscous pill design methodology leads to increased cement plug success rates:Application and case studies from southern Algeria[R]. SPE-62752-MS, 2000.
|
[10] |
张学诚, 李艳春, 刘雄明. 提高水泥塞成功率的高黏段塞的设计方法——在南阿尔及利亚油田的应用及实例分析[J]. 国外油田工程, 2009, 25(8):34-37.
ZHANG Xuecheng, LI Yanchun, LIU Xiongming. Viscous pill design methodology leads to increased cement plug success rates:Application and case studies from southern Algeria[J].Foreign Oilfield Engineering, 2009, 25(8):34-37.
|
[11] |
DAVID G CALVERT, JAMES F HEATHMAN, JAMES E. GRIFFITH. Plug cementing:Horizontal to vertical conditions[R]. SPE-30514-MS, 1995.
|
[12] |
高光军, 李凤琴, 黄柏宗. 影响水泥塞稳定性变量的试验研究[J]. 国外油田工程, 2000(9):14-16. GAO Guangjun, LI Fengqin, HUANG Baizong. An experimental study on the variables affecting the stability of cement plug[J]. Foreign Oilfield Engineering, 2000
(9):14-16.
|
[13] |
杨玉豪. 挤水泥设计计算及软件开发[D]. 成都:西南石油大学, 2014:11-12. YANG Yuhao. Design calculation and software development of squeeze cementing[D]. Chengdu:Southwest Petroleum University, 2014:11
-12.
|
[14] |
杨玉豪, 徐璧华, 张凯敏, 等. 提高挤水泥成功率对策的综述[J]. 西部探矿工程, 2014, 26(3):45-48.
YANG Yuhao, XU Bihua, ZHANG Kaimin, et al. Summary of the countermeasures for improving the success rate of squeeze cementing[J]. West-china Exploration Engineering, 2014, 26(3):45-48.
|
[15] |
党冬红, 宋元洪, 吴永超, 等. 裸眼事故复杂高压气井注侧钻水泥塞技术[J]. 钻井液与完井液, 2019, 36(1):93-96.
DANG Donghong, SONG Yuanhong, WU Yongchao, et al.Pumping cement slurry and drilling set cement plug in high pressure open hole gas well[J].Drilling Fluid & Completion Fluid, 2019, 36(1):93-96.
|