LIU Yang, CHEN Min, WU Lang, XIAN Ming, YANG Xiangyu. Managed Pressure Well Cementing Techniques for Wells with Narrow Safe Drilling Windows in Sichuan Basin[J]. DRILLING FLUID & COMPLETION FLUID, 2020, 37(2): 214-220. doi: 10.3969/j.issn.1001-5620.2020.02.014
Citation: LIU Yang, CHEN Min, WU Lang, XIAN Ming, YANG Xiangyu. Managed Pressure Well Cementing Techniques for Wells with Narrow Safe Drilling Windows in Sichuan Basin[J]. DRILLING FLUID & COMPLETION FLUID, 2020, 37(2): 214-220. doi: 10.3969/j.issn.1001-5620.2020.02.014

Managed Pressure Well Cementing Techniques for Wells with Narrow Safe Drilling Windows in Sichuan Basin

doi: 10.3969/j.issn.1001-5620.2020.02.014
  • Received Date: 2019-12-05
  • Publish Date: 2020-04-28
  • The Sichuan Basin is characterized by complex geological structures. Take the Chuanxi area (West Sichuan) as an example, wells drilled in this area have depth of at least 7000 m, and the safe drilling windows are only 0.05-0.08 g/cm3. Losses of cementing slurry have been frequently encountered, reverse squeezing of cement slurry has to be performed for the well cementing to be certified. Percent qualified cementing job was only 39.6% (calculated by cemented length). Laboratory study has been performed on managed pressure well cementing technology to improve the quality of the well cementing job. Effects of the wellbore fluid density, drilling fluid rheology, displacement flow rate and the magnitude of managed annular pressures on the losses of cement slurry and displacement efficiency were analyzed. It was found that prior to managed pressure well cementing job, the density of the wellbore fluid should be decreased by 0.05-0.08 g/cm3, the yield point of the drilling fluid should be less than 6 Pa, the displacement rate should be at least 22 L/s, that is, the annular velocity should be 0.9 m/L or higher. Also, the displacement rate at the last stage of displacement should be varying based on the equivalent density of the weak zones along the wellbore. To overcome the shortage of conventional casing running operation and WOC techniques, managed pressure casing running technique and staged pressurizing/cementing techniques were used in the field operations. Managed pressure well cementing technology has been used 26 times on wells with narrow safe drilling windows in the Sichuan Basin, and many operation records were set; the deepest well cemented with this technology was 7793 m in depth, the narrowest safe drilling window was 0.05 g/cm3, rate of one-time return of cement slurry was 100%, rate of certified well cementing job was 100%, percent length of excellent well cementing job quality was increased from 21.45% to 44.58%. The managed pressure well cementing technology helped resolve the problems of cement slurry lossed and low return rate encountered in well cementing operations in the past.

     

  • loading
  • [1]
    鲜明, 陈敏, 余才焌, 等. 动态平衡固井技术与实践[J]. 钻井液与完井液, 2017, 34(6):73-78.

    XIAN Ming, CHEN Min, YU Caijun, et al.Technology of well cementing under dynamically balanced pressure and its application[J]. Drilling Fluid & Completion Fluid, 2017, 34(6):73-78.
    [2]
    马勇, 郑有成, 徐冰清, 等. 精细控压固井平衡法固井技术的应用实践[J]. 天然气工业, 2017, 37(8):61-64.

    MA Yong, ZHENG Youcheng, XU Bingqing, et al. Application precise MPD & pressure balance cementing technology[J]. Natural Gas Industry, 2017, 37(8):61-64.
    [3]
    张华, 丁志伟, 肖振华, 等. 窄密度窗口及小间隙超深井尾管固井技术[J]. 钻井液与完井液, 2018, 35(4):88-91.

    ZHANG Hua, DING Zhiwei, XIAO Zhenhua, et al. Liner cementing in ultra-deep wells with narrow drilling window and small annular clearance[J]. Drilling Fluid & Completion Fluid, 2018, 35(4):88-91.
    [4]
    刘洋, 陈敏, 史芳芳, 等. 水泥浆失重压力评价技术研究与应用[J]. 钻井液与完井液, 2019, 36(6):749-753.

    LIU Yang, CHEN Min, SHI Fangfang, et al. Study and application of a technology for evaluating pressure loss of cement plug[J]. Drilling Fluid & Completion Fluid, 2019, 36(6):749-753.
    [5]
    EVAN RUSSELL, AARON KATZ, BRADLEY PRUETT. Achieving zonal isolation using automate managed pressure cementing[R]. SPE 179186, 2016.
    [6]
    王小文, 张维滨, 郑会铠, 等. 控压固井技术简介[J]. 西部探矿工程, 2019, 31(1):37-40.

    WANG Xiaowen, ZHANG Weibin, ZHENG Huikai, et al.Introduction to pressure controlled cementing technology[J]. West-China Exploration Engineering, 2019, 31(1):37-40.
    [7]
    郭继刚. 精细动态控压固井技术在顺南区块的应用[J]. 钻井液与完井液, 2016, 33(5):76-79.

    GUO Jigang.Application of precise dynamic pressure control well cementing technology in Block Shunnan[J]. Drilling Fluid & Completion Fluid, 2016, 33(5):76-79.
    [8]
    晏凌, 吴会胜, 晏琰. 精细控压钻井技术在喷漏同存复杂井中的应用[J]. 天然气工业, 2015, 35(2):59-63.

    YAN Ling, WU Huisheng, YAN Yan.Application of precise MPD in kick & loss wells[J].Natural Gas Industry, 2015, 35(2):59-63.
    [9]
    徐壁华, 冯青豪, 谢应权, 等. 考虑循环温度影响下注水泥流变性能计算方法[J]. 钻井液与完井液, 2017, 34(6):79-82.

    XU Bihua, FENG Qinghao, XIE Yingquan, et al.A method of calculating rheology of cement slurry affected by circulation temperature[J]. Drilling Fluid & Completion Fluid, 2017, 34(6):79-82.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (639) PDF downloads(227) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return