DANG Donghong, SONG Yuanhong, WU Yongchao, WANG Chong, HAN Gewei, WU Jinbo, YIN Lu. Pumping Cement Slurry and Drilling Set Cement Plug in High Pressure Open Hole Gas Well[J]. DRILLING FLUID & COMPLETION FLUID, 2019, 36(1): 93-96. doi: 10.3969/j.issn.1001-5620.2019.01.018
Citation: DANG Donghong, SONG Yuanhong, WU Yongchao, WANG Chong, HAN Gewei, WU Jinbo, YIN Lu. Pumping Cement Slurry and Drilling Set Cement Plug in High Pressure Open Hole Gas Well[J]. DRILLING FLUID & COMPLETION FLUID, 2019, 36(1): 93-96. doi: 10.3969/j.issn.1001-5620.2019.01.018

Pumping Cement Slurry and Drilling Set Cement Plug in High Pressure Open Hole Gas Well

doi: 10.3969/j.issn.1001-5620.2019.01.018
  • Received Date: 2018-10-09
  • Publish Date: 2019-02-28
  • Well SBC-200 is a complex well drilled in a oil and gas field in east Venezuela. Technical casing of φ244.5 mm was run to 4,864 m in this well. Pipe sticking was encountered when drilling the 4th interval (hole size φ215.7 mm) to 4 945.12 m, and several methods of freeing the pipe sticking were tried and failed. Breaking out by explosion was performed and the top of the fish was at depth of 4,897.56 m. Gas cut occurred during drilling with an oil base drilling fluid of 1.415 g/cm3, and was stopped when mud density was 1.44 g/cm3. Mud losses occurred when mud density was 1.49 g/cm3. In order to drill to the designed depth, the open hole 35.53 m above the top of the fish was filled with cement slurry and the well was sidetracked. The well was finally cemented with a cement slurry of high density, high strength and low filtration rate. The cement plug was made to satisfy the needs of sidetracking, using prepad with complex functions and techniques suitable for the well conditions.

     

  • loading
  • [1]
    刘振通,宋志强,王军,等. 硅酸钠前置液在委内瑞拉重油带固井中的应用[J]. 钻井液与完井液,2015, 32(6):96-99.

    LIU Zhentong,SONG Zhiqiang,WANG Jun, et al. Application of sodium silicate prepad fluid in cementing heavy oil zones in Venezuela[J]. Drilling Fluid & Completion Fluid, 2016, 32(6):96-99.
    [2]
    郭文猛,张小建,刘振通,等. 油基泥浆条件下固井隔离液研究与应用[J]. 新疆石油科技,2013(2):13-16. GUO Wenmeng, ZHANG Xiaojian, LIU Zhentong, et al. Study and application of isolation fluid for cementing wells under oil base mud conditions[J]. Xinjiang Petroleum Science & Technology,2013

    (2):13-16.
    [3]
    马文英, 张辉, 田军, 等. 提高第二界面固井质量的钻井液与前置液研究[J]. 钻井液与完井液,2003,20(4):27-30.

    MA Wenying, ZHANG Hui, TIAN Jun, et al. Study on drilling fluid and perflush for improving cementing quality of the second contact surface[J]. Drilling Fluid & Completion Fluid,2003,20(4):27-30.
    [4]
    刘振通,宋元洪,吴洪波,等. 特殊注水泥作业"插旗杆" 事故案例分析与思考[J]. 钻井液与完井液,2011,28(6):81-83.

    LIU Zhentong, SONG Yuanhong, WU Hongbo, et al. Analysis on trouble of pipe stuck while cementing in special cementing job[J]. Drilling Fluid & Completion Fluid, 2011, 28(6):81-83.
    [5]
    李坤,徐孝思,黄柏宗. 紧密堆积优化水泥浆体系的优势与应用[J]. 钻井液与完井液,2002,19(1):1-6.

    LI Kun, XU Xiaosi, HUANG Baizong.Advantages and application of the novel cement slurry systems developed by the concept of high packing density[J]. Drilling Fluid & Completion Fluid,2002,19(1):1-6.
    [6]
    赵普春,娄京伟. 塔河碳酸盐岩缝洞油藏深井裸眼段打水泥塞工艺技术[J]. 石油钻探技术,2006,34(6):77-79.

    ZHAO Puchun,LOU Jingwei. Drilling cementing plug in open-hole section located on carbonate crack reservoir in the Tahe Oilefield[J]. Petroleum Drilling Techniques, 2006,34(6):77-79.
    [7]
    李鹏晓,孙富全,何沛其,等. 紧密堆积优化固井水泥浆体系堆积密实度[J]. 石油钻采工艺,2017, 39(3):307-312.

    LI Pengxiao, SUN Fuquan, HE Peiqi, et al. Packing compactness of cementing slurry system for close packing optimization[J]. Oil Drilling & Production Technology, 2017,39(3):307-312.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (458) PDF downloads(211) Cited by()