HE Jianyong, LI Yongjun, SONG Yuanhong, CUI Shuqing, MA Qianyun, TANG Hongbin, LI Huan. Cementing Technology for Buried Hill Reservoirs in Block Yangshuiwu in Huabei Oilfield[J]. DRILLING FLUID & COMPLETION FLUID, 2018, 35(2): 104-109. doi: 10.3969/j.issn.1001-5620.2018.02.017
Citation: HE Jianyong, LI Yongjun, SONG Yuanhong, CUI Shuqing, MA Qianyun, TANG Hongbin, LI Huan. Cementing Technology for Buried Hill Reservoirs in Block Yangshuiwu in Huabei Oilfield[J]. DRILLING FLUID & COMPLETION FLUID, 2018, 35(2): 104-109. doi: 10.3969/j.issn.1001-5620.2018.02.017

Cementing Technology for Buried Hill Reservoirs in Block Yangshuiwu in Huabei Oilfield

doi: 10.3969/j.issn.1001-5620.2018.02.017
  • Received Date: 2017-12-16
  • Publish Date: 2018-03-30
  • Three key exploratory wells have been deployed in Huabei Oilfield to develop the buried hill reservoirs in Block Yangshuiwu in Langgu sag of Jizhong depression. The geologic conditions in the buried hill are complex. The formation pressure coefficient is 0.94-1.09. There exist multiple deep active oil and gas zones. Lost circulation has occurred frequently in this area. High geothermal gradient, slim hole, narrow annular clearance, long section of liner string to be cemented and rigorous requirements on the integrity of cement sheath. It is understood from these facts that cementing of the 127 mm liner string is highly risky, and operation safety and job quality of well cementing are difficult to guarantee. Efforts have made to deal with these difficulties:1) optimizing technology for borehole cleaning, using cyclone sub centralizer to ensure the success of casing running. 2) using computer software to simulate displacing efficiency and pressure changes at critical spots. Appropriately adjust operation parameters to ensure pressure control. 3) using tough cement slurry and flushing spacer system, designing appropriate operational parameters, ensuring the stability of cement slurry and the toughness of set cement that satisfies the requirements for SRV fracturing. Field operations on three wells show that the application of cementing technology remarkably improved the job quality of well cementing, providing technical support for well cementing in the buried hill in the Block Yangshuiwu in Huabei Oilfield.

     

  • loading
  • [1]
    杜金虎,何海清,赵贤正,等. 渤海湾盆地廊固凹陷杨税务超深超高温奥陶系潜山油气勘探重大突破实践与启示[J]. 中国石油勘探,2017,22(2):1-12.

    DU Jinhu,HE Haiqing,ZHAO Xianzheng,et al. Practice and enlightenment of major breakthroughs in oil and gas exploration in the yangshuiwu ultra-high temperature ordovician buried hills of langgu sag of bohai bay basin[J].China Petroleum Exploration,2017,22(2):1-12.
    [2]
    岳家平,徐翔,李早元,等. 高温大温差固井水泥浆体系研究[J]. 钻井液与完井液,2012,29(2):59-62.

    YUE Jiaping, XU Xiang, LI Zaoyuan,et al.Study on cement slurry system with high temperature and large temperature difference[J].Drilling Fluid & Completion Fluid,2012,29(2):59-62.
    [3]
    钟福海,王合林,单保东,等. 开窗侧钻小井眼小间隙固井技术[J]. 钻井液与完井液,2015,32(1):90-92.

    ZHONG Fuhai, WANG Helin,SHAN Baodong, et al. Small gap cementing technology in sidetrack slim hole[J]. Drilling Fluid & Completion Fluid,2015,32(1):90-92.
    [4]
    钟福海,刘硕琼,徐明,等.苏桥深潜山枯竭油气藏储气库固井技术[J].钻井液与完井液,2014,31(1):64-67.

    ZHONG Fuhai, LIU Shuoqiong, XU Ming,et al. Cementing technology for gas storage in gas pools of suqiao deep buried hill[J].Drilling Fluid & Completion Fluid,2014,31(1):64-67.
    [5]
    李宁,杜建波,艾正青,等. 高温深井环境下水泥环完整性模拟评价及改进措施[J]. 钻井液与完井液, 2017,34(1):106-111.

    LI Ning,DU Jianbo,AI Zhengqing, et al.Simulation evaluation and improvement measures of cement ring integrity in high temperature and deep well environment[J].Drilling Fluid & Completion Fluid, 2017,34(1):106-111.
    [6]
    徐小峰,孙宁,孟英峰,等. 冀东油田大斜度大位移井井眼清洁技术[J]. 西南石油大学学报(自然科学版), 2017,39(1):148-154. XU Xiaofeng,SUN Ning,MENG Yingfeng,et al. Wellbore cleaning technology for large-scale extended reach wells in Jidong oilfield[J].Journal of Southwest Petroleum University (Natural Science Edition),2017, 39(1):148-154.
    [7]
    和建勇,党冬红,刘艳军,等. 南堡36-P3001井高温小间隙尾管固井技术[J]. 石油钻采工艺,2014,36(1):48-50.

    HE Jianyong, DANG Donghong, LIU Yanjun, et al. High temperature small annular space liner cementing techniques of Nanpu 36-P3001 well[J].Oil Drilling &Production Technology,2014,36(1):48-50.
    [8]
    阮臣良,冯丽莹,张金法,等. 内嵌卡瓦尾管悬挂器的研制与应用[J]. 石油机械,2012,40(8):15-18.

    RUAN Chenliang, FENG Liying,ZHANG Jinfa, et al. Development and application of embedded cavas tail pipe hanger[J].Petroleum Machinery,2012,40(8):15-18.
    [9]
    李丽,刘伟,刘徐慧,等. 川西低固相钻井完井液泥饼清除技术初探[J]. 钻井液与完井液,2010,27(6):27-29.

    LI Li,LIU Wei,LIU Xuhui,et al.Low solidphase drilling and completion fluid mud cake removal technology in western Sichuan[J].Drilling Fluid & Completion Fluid,2010,27(6):27-29.
    [10]
    靳建洲,孙富全,侯薇,等. 胶乳水泥浆体系研究与应用[J]. 钻井液与完井液,2006,23(2):37-40.

    JIN Jianzhou,SUN Fuquan,HOU Wei,et al. Research and application of latex cementing system[J].Drilling Fluid & Completion Fluid,2006,23(2):37-40.
    [11]
    宋有胜,邹建龙,赵宝辉,等. 高石梯-磨溪区块高压气井尾管固井技术[J]. 钻井液与完井液,2017,34(2):111-116.

    SONG Yousheng,ZOU Jianlong,ZHAO Baohui,et al. Cementing the ϕ177.8 mm liner in the block Gaoshiti-Moxi[J].Drilling Fluid & Completion Fluid,2017,34(2):111-116.
    [12]
    李早元,郭小阳,韩林,等.胶乳对水泥石三轴力学形变能力的作用[J].石油学报,2007,28(4):126-129.

    LI Zaoyuan,GUO Xiaoyang,HAN Lin,et al.Effect of latex on the triaxial mechanical deformation of cement paste[J].Journal of Petroleum,2007,28(4):126-129.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (552) PDF downloads(207) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return