Citation: | XIAN Ming, CHEN Min, YU Caijun, LIU Yang, WU Lang. Technology of Well Cementing under Dynamically Balanced Pressure and Its Application[J]. DRILLING FLUID & COMPLETION FLUID, 2017, 34(6): 73-78. doi: 10.3969/j.issn.1001-5620.2017.06.014 |
[1] |
SALEEM CHAUDHARY,ARCHIE J FELIO, JOSEPH MICHAEL SHINE,et al.Improving cement placement by accounting for lost circulation and NAF compressibility[C].OTC 23942,2013.
|
[2] |
王希勇, 蒋文震, 杨昌学, 等. 川西地区固井及完井过程中井漏原因分析及对策[J]. 天然气工业, 2007(4):56-59. WANG Xiyong, JIANG Wenzhen, YANG Changxue, et al. Causes of lost circulation occurred in cementing and completion operations in west sichuan area and control measures[J].Natural Gas Industry, 2007
(4):56-59.
|
[3] |
DON M HANNEGAN.Managed pressure drilling technology:application,variations and case histories[J]. SPE112803-DL.
|
[4] |
DON M HANNEGAN.Case studies-offshore managed pressure drilling[J].SPE101855.
|
[5] |
黄兵,石晓兵,李枝林,等. 控压钻井技术研究与应用新进展[J]. 钻采工艺,2010,9(1):1-4.
HUANG Bing SHI Xiaobing LI Zhilin et al.Research and application of MPD technique[J].Drilling & Production Technology,2010,9(1):1-4.
|
[6] |
ASHOK KUMAR SANTRA,REDDY B R,MFON ANTIA.Designing cement slurries for preventing formation fluidinflux after placement[C]. SPE 106006,2007.
|
[7] |
GONZALO VAZQUEZ,AISKELY MARGARITA BLANCO,ALICIA MARGARITA COLINA. A methology to evaluate the gas migration in cement slurries[C].SPE 94901,2005.
|
[8] |
郭继刚. 精细动态控压固井技术在顺南区块的应用研究[J]. 钻井液与完井液,2016, 33(5):76-79.
GUO Jigang. Application of precise dynamic pressure control well cementing technology in block Shunnan[J]. Drilling Fluid & Completion Fluid,2016, 33(5):76-79.
|