Volume 34 Issue 5
Sep.  2017
Turn off MathJax
Article Contents
MING Xiansen, YUAN Zhiping, BIN Chenggang. Drilling Challenges and Drilling Fluid Technologies for Shale Gas Drilling in Changning Area[J]. DRILLING FLUID & COMPLETION FLUID, 2017, 34(5): 44-49. doi: 10.3969/j.issn.1001-5620.2017.05.008
Citation: MING Xiansen, YUAN Zhiping, BIN Chenggang. Drilling Challenges and Drilling Fluid Technologies for Shale Gas Drilling in Changning Area[J]. DRILLING FLUID & COMPLETION FLUID, 2017, 34(5): 44-49. doi: 10.3969/j.issn.1001-5620.2017.05.008

Drilling Challenges and Drilling Fluid Technologies for Shale Gas Drilling in Changning Area

doi: 10.3969/j.issn.1001-5620.2017.05.008
  • Received Date: 2017-05-22
  • Publish Date: 2017-09-30
  • Challenges encountered in shale gas drilling in Changning area from the Jialingjiang Formation to Hanjiadian Formation are as follows:bit balling in drilling long section of mudstones, mechanical collapse of formation with developed beddings, borehole wall collapse in drilling the top section of well causing pipe sticking, developed fractures with good connectivity resulting in mud losses, borehole enlargement resulted from formation creep, and contamination to drilling fluid by mudstones. Challenges encountered in drilling fluid maintenance and the solution were also provided in this paper. Based on the analyses of drilling problems encountered from Jialingjiang Formation and Hanjiadian Formation, the drilling fluid formulation to be used was optimized accordingly. The optimized drilling fluid was used in 10 times in different wells in Changning area, greatly reduced the occurrence of downhole problems. With the optimized drilling fluid, the Jialingjiang gypsum formation was penetrated with no troubles, the Feixianguan mudstone formation was drilled with success, and cave-in of the Changxing-Longtan formations was avoided. Any downhole complicationsrelated with drilling fluid were all avoided. Lithology variance in the Changning area is remarkable. An in-depth understanding of the formations in this area, and specific suggestions and measures presented in drilling fluids design help minimize the occurrence of downhole complications, providing technical support to quality, efficient and cost-effective drilling of shale gas.

     

  • loading
  • [1]
    王中华. 国内页岩气开采技术进展[J]. 中外能源, 2013, 18(2):23-32.

    WANG Zhonghua. The progress of the exploitation technology of shale gas in China[J].Sino-Global Energy, 2013,18(2):23-31.
    [2]
    U.S. Energy Information Administration. World shale gas resources:An initial assessment of 14 regions outside the United States[M]. Washington D C:U.S. Department of Energy, 2011:1-365.
    [3]
    刘敬平,孙金声. 钻井液活度对川滇页岩气地层水化膨胀与分散的影响[J]. 钻井液与完井液,2016,33(2):31-35.

    LIU Jingping,SUN Jinsheng. Impact of drilling fluids activity on hydration expansion and dispersion in gas shale formations in Chuan or Dian[J]. Drilling Fluid & Completion Fluid,2016,33(2):31-35.
    [4]
    王中华. 页岩气水平井钻井液技术的难点及选用原则[J]. 中外能源, 2012, 17(4):43-47.

    WANG Zhonghua. Difficulty and applicable principle of the drilling fluid technology of horizontal wells for shale gas[J].Sino-Global Energy, 2012,17(4):43-47.
    [5]
    崔思华,班凡生,袁光杰. 页岩气钻完井技术现状及难点分析[J]. 天然气工业,2011,31(4):72-75.

    CUI Sihua, BAN Fansheng, YUAN Guangjie. Status quo and challenges of global shale gas drilling and completion[J]. Natural Gas Industry, 2011,31(4):72-75.
    [6]
    陈胜, 余可芝, 邱文发, 等. 预防PDC钻头泥包的钻井液工艺技术[J]. 钻井液与完井液, 2013,30(1):38-40.

    CHEN Sheng, YU Kezhi,QIU Wenfa, et al.Drilling fluid technology of preventing PDC bit balling[J].Drilling Fluid & Completion Fluid, 2013, 30(1):38-40.
    [7]
    杨宇平,孙金生,杨枝,等. 快速钻井剂稳定井壁快速钻进作用机理研究[J]. 西南石油大学学报:自然科学版,2010,32(1):165-169.

    YANG Yuping,SUN Jinsheng,YANG Zhi,et al. Study on the mechanism of increasing ROP & borehole stability of fast penetration drilling fluid[J].Journal of Southwest Petroleum University:Science & Technology Edition, 2010,32(1):165-169.
    [8]
    中国石油勘探与生产分公司工程技术与监督处. 钻井监督手册(上册)[M]. 北京:石油工业出版社, 2005:244-288,587-592.

    Chinese petroleum exploration and production company engineering and supervision department.(I) drilling supervision Handbook[M]. Beijing:Petroleum Industry Press, 2005:244-288587-592.
    [9]
    HALE A H,MODY F K.Experimental investigation of the influence of chemical potential on wellbore stability[R].SPE 23885,1992.
    [10]
    邓传光,朱明玉,黄焰,等.PDC钻头泥包原因分析及对策[J]. 钻采工艺,2006, 29(6):127-128.

    Deng Chuanguang, Zhu Mingyu, Huang Yan, et al.Cause analys of PDC bit balling and its prenentive[J]. Drilling & Production Technology,2006, 29(6):127-128.
    [11]
    陈胜,余可芝,邱文发,等. 预防PDC钻头泥包的钻井液工艺技术[J]. 钻井液与完井液,2013,30(1):38-40.

    CHEN Sheng, YU Kezhi,QIU Wenfa,et al. Drilling fluid technology of preventing PDC bit balling[J]. Drilling Fluid & Completion Fluid, 2013.30(1):38-40.
    [12]
    徐先国,张岐安. 新型胺基聚醇防塌剂研究[J]. 石油钻采,2010,33(1):93-95.

    XU Xianguo,ZHANG Qiam. Study of new polyamine based anti-sloughing agent[J].Oil Drilling and Production, 2010, 33(1):93-95.
    [13]
    邱正松,钟汉毅,黄维安. 新型聚胺页岩抑制剂特性及作用机理[J]. 石油学报,2011,32(4):678-682.

    QIU Zhengsong,ZHONG Hanyi,HUANG Weian. Properties and mechanism of a new polyamine shale inhibitor[J]. Acta Petrolei Sinica,2011,32(4):678-682.
    [14]
    SENSOY T,CHENEVERT M E,SHARMA M M.Minimizing water invasion in shale using nanoparticles[C]//SPE Annual Technical Conference and Exhibition. Louisiana:Society of Petroleum Engineers, 2009.
    [15]
    谢晓永,王怡.川西须家河组页岩气水基钻井液技术[J]. 断块油气田,2014,21(6):802-805.

    XIE Xiaoyong,WANG Yi. Water-based drilling fluid technology for Xujiahe Formation shale gas in western Sichuan[J]. Fault-Block Oil & Gas Field,2014,21(6):802-805.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (641) PDF downloads(253) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return