Volume 33 Issue 3
May  2016
Turn off MathJax
Article Contents
ZHU Xuefei, YAN Fushou, SHU Yiyong, SUN Liangguo, SHEN Rendong. Displace Open Hole Full of High Density OBM with WBM[J]. DRILLING FLUID & COMPLETION FLUID, 2016, 33(3): 56-59. doi: 10.3969/j.issn.1001-5620.2016.03.011
Citation: ZHU Xuefei, YAN Fushou, SHU Yiyong, SUN Liangguo, SHEN Rendong. Displace Open Hole Full of High Density OBM with WBM[J]. DRILLING FLUID & COMPLETION FLUID, 2016, 33(3): 56-59. doi: 10.3969/j.issn.1001-5620.2016.03.011

Displace Open Hole Full of High Density OBM with WBM

doi: 10.3969/j.issn.1001-5620.2016.03.011
  • Received Date: 2016-02-09
  • Publish Date: 2016-05-31
  • The lithology of the "Kumugeliemu Group" in the Block Keshen (Kuche piedmont structure) of the Tarim Oilfield is of compound salt and gypsum having high pressure coefficients. Long open hole drilling and plastic deformation of the formations penetrated made drilling very difficult. Oil base drilling fluids have long been used in the drilling operation. The well KS603 drilled in this area has experienced mud losses at the end of salt and gypsum drilling. To avoid losses of the expensive oil base drilling fluids during casing running, unsaturated brine muds have been used at the end of the drilling of the salt and gypsum formations. In displacing the oil base mud, a thinner solution with high concentration of alkalis is added into the spacer fluid in an effort to maintain a low viscosity of the spacer through the thinning effect of the alkali solution and the neutralization of calcium in the oil base drilling fluid with OH-. Since lost circulation material (LCM) cannot be added directly into the spacer, the first pit of mud displaced into the hole will be treated with 8% of LCM to avoid losses of the mud. To maintain the borehole stability of the salt and gypsum formations, the displacing mud will be weighted to 2.39 g/cm3, and the chloride maintained at no less than 1.8×105 mg/L to avoid the dissolution of formation salts. NTA-2 is used in the displacing mud to avoid salts from recrystallizing. Before running the casing strings, the compressive capacity of the weak points along the borehole is increased with LCMs to avoid mud losses during casing running. The properties of the displacing fluids have been proved stable by field operations. Wiper trips using drill strings with no centralizers, one centralizer, three centralizers, or four centralizers have been performed without a hitch. After 72 hours of waiting for logging the creeping of the salt and gypsum formations, a wiper trip with four-centralizer drill string, the casing running, and the well cementing have all been done right the first time. The borehole wall has remained stable during the operation, with no downhole troubles occurred.

     

  • loading
  • 于延雄,代一钦. 涪陵页岩气田油基钻井液防漏堵漏技术探讨[J]. 江汉石油科技,2015,25(1):33-36. YU Yanxiong,DAI Yiqin. Fuling oil-base drilling fluid plugging technology to explore shale gas field[J].Jianghan Petroleum Science And Technology,2015,25(1):33-36.
    刘振通,李利军,宋元洪,等.KS204井盐膏层长封固段尾管固井技术膏盐层固井水泥技术[J]. 钻井液与完井液,2012,29(3):61-63. LIU Zhentong,LI Lijun,SONG Yuanhong,et al. KS204 well salt paste layer long cementing section of liner cementing technology in salt layer cementing cement technology[J].Drilling Fluid & Completion Fluid,2012, 29(3):61-63.
    曹来顺.KCl欠饱和盐水钻井液在西部深井中的应用[J]. 胜利油田职工大学学报,2009,23(1)46-48. CAO Laishun.KCl undersaturated salt water drilling fluid applications in deep wells in western[J].Journal of Shengli Oil Field Worker University,2009,23(1):46-48.
    刘振东,薛玉志,周守菊,等.全油基钻井液完井液体系研究与应用[J]. 钻井液与完井液,2009,26(6)10-12. LIU Zhendong,XUE Yuzhi,ZHOU Shouju,et al. All oil-base drilling completion fluid system research and application[J].Drilling Fluid & Completion Fluid,2009, 26(6):10-12.
    何涛,李茂森,杨兰平,等.油基钻井液在威远地区页岩气水平井中的应用[J]. 钻井液与完井液,2012,29(3):1-5. HE Tao,LI Maosen,YANG Lanping, et al. Shale gas horizontal well, the application of oil-base drilling fluid in Hubei Weiyuan region[J].Drilling Fluid & Completion Fluid,2012,29(3):1-5.
    杨晓冰,蔺志鹏,陈鑫,等.土库曼斯坦南约略坦洛坦复杂盐膏层钻井液技术[J].天然气工业,2011,31(7):55-58. YANG Xiaobing,LIN ZhiPeng,CHEN Xin, et al. Turkmenistan, south temple instead los temple complex salt-gypsum layer drilling fluid technology[J]. Natural Gas Industry,2011,31(7):55-58.
    黄宏军,杨海军,蔺志鹏,等. 尤拉屯No.15井超高密度聚磺复合盐水钻井液技术[J]. 钻井液与完井液, 2009,26(5):10-13. HUANG Hongjun,YANG Haijun,LIN ZhiPeng,et al.Euler tuen No.15 wells, high density polyethylene sulfonated compound brine drilling fluid technology[J].Drilling Fluid &Completion Fluid,2009,26(5):10-13.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (748) PDF downloads(210) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return