Citation: | LU Feifei, WANG Yonghong, LIU Yun, LI Fei, BAN Shengfu, ZHU Wenhao. Anti-channeling HTHP Liner Cementing Technologies Used in Block Shunnan[J]. DRILLING FLUID & COMPLETION FLUID, 2016, 33(2): 88-91,95. doi: 10.3969/j.issn.1001-5620.2016.02.019 |
杨智光,崔海清,肖志兴.深井高温条件下油井水泥强度变化规律研究[J].石油学报,2008,29(3):435-437.Yang Zhiguang, Cui Haiqing, Xiao Zhixing.Change of cement stone strength in the deep high temperature oil well[J].Acta Petrolei Sinica, 2008, 29(3):435-437.
|
何英, 徐依吉, 熊生春, 等. 丁苯胶乳的研制及其水泥浆性能评价[J]. 中国石油大学学报(自然科学版), 2008, 32(5):121-125. He Ying, Xu Yiji, Xiong Shengchun, et al.Preparation of styrene butadiene latex and evaluation of cement slurry performance[J].Joumal of China University of Petroleum, 2008, 32(5):121-125.
|
马超, 赵林, 周大林, 等. 抗温防窜胶乳水泥浆体系的研制[J]. 天然气工业, 2008, 28(12):57-59. Ma Chao, Zhao Lin, Zhou Dalin, et al. Research on latex cement slurry systemwith heat-resistingand antichanneling performance[J]. Natural Gas Industry, 2008, 28(12):57-59.
|
刘树武.SYG胶乳水泥浆体系的研究应用[D]. 东营:中国石油大学(华东), 2007. Liu Shuwu.Study dnd application of SYG latex cement slurry[D].China University of Petroleum, 2007.
|
牛新明, 张克坚, 丁士东, 等. 川东北地区高压防气窜固井技术[J]. 石油钻探技术, 2008, 36(3):10-15. Niu Xinming, Zhang Kejian, Ding Shidong, et al. Gas migration prevention cementing technologies in northeast sichuan area[J].Petroleum Drilling Techniques, 2008, 36(3):10-15.
|
杨建雄, 杨宝国, 胡小兰, 等. 高温高压固井防气窜技术[J]. 江汉石油职工大学学报, 2009, 22(2):34-36. Yang Jianxiong, Yang Baoguo, Hu Xiaolan, et al. High temperature and high pressure anti-gas channeling cementing technology[J].Journal of Jianghan Pet roleum University of Staff and Workers, 2009, 22(2):34-36.
|
周仕明, 李根生, 初永涛, 等. 防气窜固井分段设计方法[J]. 石油钻探技术, 2013, 41(5):52-55. Zhou Shiming, Li Gensheng, Chu Yongtao, et al. Section design for anti-gas channeling cementing[J]. Petroleum Drilling Techniques, 2013, 41(5):52-55.
|
高元, 杨广国, 常连玉, 等. 塔河油田桥古区块防气窜固井技术[J]. 石油钻采工艺, 2013, 35(6):40-43. Gao Yuan, Yang Guangguo, Chang Lianyu, et al. Cementing technology for gas channeling prevention in qiaogu block of tahe oilfield[J].Oil Drilling & Production Technology, 2013, 35(6):40-43.
|