Volume 32 Issue 5
Sep.  2015
Turn off MathJax
Article Contents
LI Xiaoqi. Cementing of Wells with Lost Circulation in Rumaila Oilfield[J]. DRILLING FLUID & COMPLETION FLUID, 2015, 32(5): 54-57. doi: 10.3969/j.issn.1001-5620.2015.05.013
Citation: LI Xiaoqi. Cementing of Wells with Lost Circulation in Rumaila Oilfield[J]. DRILLING FLUID & COMPLETION FLUID, 2015, 32(5): 54-57. doi: 10.3969/j.issn.1001-5620.2015.05.013

Cementing of Wells with Lost Circulation in Rumaila Oilfield

doi: 10.3969/j.issn.1001-5620.2015.05.013
  • Received Date: 2015-04-25
  • Publish Date: 2015-09-30
  • Low fracturing pressures of the Damman and Hartha formations in the Rumaila Oilfield have been causingmud losses in cementing the technical casing strings. The existence of borehole wall washout (erosion) and tight holes have resulted in poor cement slurry displacement. To overcome these problems, a plug flow low friction prepad fluid has recently been developed. This prepad fluid, having densities between 1.00 g/cm3 and 1.80 g/cm3, was formulated with non-polymeric suspending agent DF-1, flushing agent DF-3, and organic solvent, DF-4, as flow pattern modifier. It has low flow friction, high flushing performance and easy-to-control rheology, which help improve the displacement efficiency of cement slurry at low flow rates. A low density (1.00-1.35 g/cm3) cement slurry was formulated with nano silicon sol as the stabilizer to improve the settling stability of the slurry. The compressive strength of the set cement at room temperature after 48 h is greater than 14 MPa. Cementing techniques using the prepad fluid and the cement slurry were developed as guidance for proper field operation. The prepad fluid and the cement slurry have been successfully used on 5 wells, with no lost circulation. Number of well sections cemented with acceptable job quality is increased by 21%.

     

  • loading
  • 张立刚,金显鹏,吕德庆,等.煤层气井注水泥顶替效率研究[J].煤田地质与勘探, 2014, 42(3):43-46. Zhang Ligang, Jin Xianpeng, Lü Deqing, et al. Displacement efficiency of cementing in CBM well[J]. Coal Geology & Exploration, 2014, 42(3):43-46.
    高永海,孙宝江,赵欣欣,等.前置液流变性对顶替界面稳定性影响的数值模拟[J].中国石油大学学报:自然科学版, 2007, 31(6):51-54. Gao Yonghai, Sun Baojiang, Zhao Xinxin, et al. Numerical simulation on influence of rheological property of front fluid on stability of cement displacement interface[J]. Journal of China University of Petroleum:Edition of Natural Science, 2007, 31(6):51-54.
    罗杨,王强,许桂莉,等.一种超低密度高强度水泥浆配方的优选[J].钻井液与完井液, 2009, 26(3):52-55. Luo Yang, Wang Qiang, Xu Jiali, et al.The optimization of an ultra low density high strength cement slurry[J]. Drilling Fluid & Completion Fluid, 2009, 26(3):52-55.
    黄柏宗.紧密堆积理论优化的固井材料和工艺体系[J].钻井液与完井液, 2001, 18(6):1-8. Huang Bozong. New cementing materials and technique developed on the concept of high packing density[J]. Drilling Fluid & Completion Fluid, 2001, 18(6):1-8.
    贾维君.DFC非漂珠低密度水泥浆体系实验研究[J].石油钻采工艺, 2008, 30(5):44-47. Jia Weijun.Experimental study of DFC non floating bead low density cement slurry system[J]. Oil Drilling & Production Technology, 2008, 30(5):44-47.
    孙清华,彭明旺,夏宏南,等.低压易漏井提高固井质量的研究与应用[J].断块油气田, 2008, 15(1):98-100. Sun Qinghua, Peng Mingwang, Xia Hongnan, et al. Research and application on technology of improving cement quality in low pressure and easy leaking wells[J]. FaultBlock Oil & Gas Field, 2008, 15(1), 98-100.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (590) PDF downloads(256) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return