WANG Weiliang, ZHANG Xiongxiong, TIAN Fengjun, XIAO Jianfeng, LIU Xuexiang, WANG Haibao, TAN Xuebin. Drilling Fluid Technology for Horizontal Well Guping 28-21 of High Horizontal Displacement to Vertical Depth Ratio[J]. DRILLING FLUID & COMPLETION FLUID, 2015, 32(2): 89-92. doi: 10.3969/j.issn.1001-5620.2015.02.024
Citation: WANG Weiliang, ZHANG Xiongxiong, TIAN Fengjun, XIAO Jianfeng, LIU Xuexiang, WANG Haibao, TAN Xuebin. Drilling Fluid Technology for Horizontal Well Guping 28-21 of High Horizontal Displacement to Vertical Depth Ratio[J]. DRILLING FLUID & COMPLETION FLUID, 2015, 32(2): 89-92. doi: 10.3969/j.issn.1001-5620.2015.02.024

Drilling Fluid Technology for Horizontal Well Guping 28-21 of High Horizontal Displacement to Vertical Depth Ratio

doi: 10.3969/j.issn.1001-5620.2015.02.024
  • Received Date: 2014-05-23
  • Publish Date: 2015-03-31
  • The well Guping 28-21 is a horizontal well having the longest horizontal length (2,006 m) in Changqing Oilfield. It has a ratio of horizontal displacement to vertical depth of 1.7. The reservoir is of low porosity, ultra-low permeability, low electric resistance and high shale content. A CQSP-2 compound salts drill-in fluid was formulated to drill the reservoir section. CQSP-2 helped stabilize borehole wall in horizontal section of the well which is 418 m in length, having 20.84% of mudstone and carbonaceous mudstone penetrated along the hole. A gauge hole was obtained, with maximum hole enlargement of 1.61%, minimum of 0.05%, and an average of 0.63%. Friction coefficient in the horizontal drilling was kept at 0.03-0.05, showing good lubricity for the drilling. Hole cleaning performance was satisfactory, with no downhole troubles arising with hole cleaning. Good reservoir protection was achieved as selfflow was found when the well was initially put into production, giving a daily production of 83.6 t, seven times of the average daily production of other wells in Block Heshui.

     

  • loading
  • 何振奎,徐同台,李树斌,等. 宝南侏罗系地层井壁失稳机理的研讨[J]. 钻井液与完井液,2013,30(5):13-17. He Zhenkui, Xu Tongtai, Li Shubin, et al. Research of mechanism of Jurassic Stratum borehole instability in Bao Nan[J]. Drilling Fluid and Completion Fluid, 2013,30(5):13-17.
    相恒富,孙宝江,李昊,等. 大位移水平井段岩屑运移实验研究[J]. 石油钻采工艺,2014,36(3):1-6. Xiang Hengfu,Sun Baojiang,Li Hao,et al.Experimental research on cuttings transport in extened-reach horizontal well[J].Oil Drilling & Production Technology,2014,36(3):1-6.
    姜伟.大位移钻井技术在在渤海QHD32-6油田的应用[J]. 石油钻采工艺,2001,23(4):1-6. Jiang Wei. Application of large displacement well drilling technology in Bohai QHD32-6 oilfield[J].Oil Drilling & Production Technology, 2001,23(4):1-6.
    蔡利山,林永学,王文立. 大位移井钻井液技术综述[J]. 钻井液与完井液,2010,27(4):1-13. Cai Lishan,Lin Yongxue,Wang Wenli, et al. Review on the technology of extended-reach well drilling fluid[J]. Drilling Fluid & Completion Fluid,2010,27(4):1-13.
    刘兆利,李晓明,张建卿,等. 无土相复合盐水钻井液的研究与应用[J]. 钻井液与完井液2010,27(6):34-37. Liu Zhaoli, Li Xiaoming, Zhang Jianqing, et al.Research and application of No Bentonite compound salt water drilling fluid[J]. Drilling Fluid and Completion Fluid,2010,27(6):34-37.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (701) PDF downloads(209) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return