Abstract:
The well Qieshen-1 is an exploration well deployed by Sinopec in block Tazhong in Tarim Basin. The well was drilled to a depth of 8,745.00 m in four intervals, with static bottom hole temperature being 196 ℃. Technical difficulties such as high temperature, high pressure, salt formation, narrow clea...
XU Dawei, WANG Xiaojing, XU Chunhu, et al.Extra-high temperature high density cement slurry for cementing liners through salt formation in well Qieshen-1[J]. Drilling Fluid & Completion Fluid,2024, 41(5):622-629. doi: 10.12358/j.issn.1001-5620.2024.05.009.