[1] |
郭太现, 苏彦春. 渤海油田稠油油藏开发现状及技术发展方向[J]. 中国海上油气, 2013, 25(4):26-30.GUO Taixian, SU Yanchun. Current status and technical development direction in heavy oil reservoir development in Bohai oilfielfds[J]. China Offshore Oil and Gas, 2013, 25(4):26-30.
|
[2] |
邓运华. 渤海油区稠油成因探讨[J]. 中国海上油气, 2006, 18(6):61-64.DENG Yunhua. A discussion on the origin of heavy oil in Bohai oil province[J]. China Offshore Oil and Gas, 2006, 18(6):61-64.
|
[3] |
李早元, 武鹏, 吴东奎, 等. 稠油热采井固井用铝酸盐水泥浆体系的研究及应用[J]. 钻井液与完井液, 2014, 31(5):71-74.LI Zaoyuan, WU Peng, WU Dongkui, et al. Study on and application of aluminate cement slurry in cementing heavy oil thermal recovery well[J]. Drilling Fluid & Completion Fluid, 2014, 31(5):71-74.
|
[4] |
韩雪银, 付建民, 刘玉杰, 等.LD27-2油田稠油热采井固井技术难点与对策[J]. 石油钻采工艺, 2015, 37(6):31-35.HAN Xueyin, FU Jianmin, LIU YujiE, et al. Difficulties in cementing technology for heavy oil thermal recovery wells LD27-2 oilfield and relevant solutions[J].Oil Drilling & Production Technology, 2015, 37(6):31-35.
|
[5] |
李进, 龚宁, 李早元, 等. 射孔完井工况下固井水泥环破坏研究进展[J]. 钻井液与完井液, 2016, 33(6):10-16.LI Jin, GONG Ning, LI Zaoyuan, et al. Progress in studying cement sheath failure in perforated wells[J]. Drilling Fluid & Completion Fluid, 2016, 33(6):10-16.
|
[6] |
ZAOYUAN LI, KAI ZHANG, XIAOYANG GUO, et al. Study of the failure mechanisms of a cement sheath based on an equivalent physical experiment[J]. Journal of Natural Gas Science and Engineering, 2016, 31:331-339.
|
[7] |
杨振杰, 姜晓强, 吴志强, 等. 固井水泥环完整性模拟评价实验仪研究[J]. 钻井液与完井液, 2013, 30(6):9-12.YANG Zhenjie, JIANG Xiaoqiang, WU Zhiqiang, et al. Research on simulation evaluation instrument or the integrity of cement sheath[J]. Drilling Fluid & Completion Fluid, 2013, 30(6):9-12.
|
[8] |
钱大伟, 许兵, 刘宝生, 等. 海上探井稠油热采测试井口抬升问题的对策研究[J]. 钻采工艺, 2014, 37(6):62-64.QIAN Dawei, XU Bing, LIU Baosheng, et al. Counter measure research on wellhead lifting in offshore oilfield heavy oil exploration well thermal recovery test[J]. Drilling & Production Technology, 2014, 37(6):62-64.
|
[9] |
黄志云. 稠油热采井井口抬升问题防治措施[J]. 石化技术, 2016(1):85-86. HUANG Zhiyun. Study on preventive measures for wellhead lifting of heavy oil thermal recovery well[J]. Petrochemical Technology, 2016(1):85-86.
|
[10] |
于继飞, 吴晓东, 韩国庆, 等. 海上油井井口温度计算方法探讨[J]. 中国海上油气, 2009, 21(5):332-334.YU Jifei, WU Xiaodong, HAN Guoqing, et al. The discussion about how to calculate offshore wellhead temperature[J]. China Offshore Oil and Gas, 2009, 21(5):332-334.
|
[11] |
MCCABE A C. Well vertical movement on platform wells[C].SPE 19241, 1989.
|
[12] |
章国华. 可伸缩式热采井口套管头的研制[J]. 石油钻采工艺, 2013, 35(2):74-77.ZHANG Guohua. The development of the extensible thermal recovery wellhead casing head[J]. Oil Drilling & Production Technology, 2013, 35(2):74-77.
|
[13] |
赵益忠. 长封固段固井套管热应力分析[J]. 钻采工艺, 2007, 30(4):109-111.ZHAO Yizhong. The casing thermal stress analysis of long cementing section[J]. Drilling & Production Technology, 2007, 30(4):109-111.
|
[14] |
万仁傅, 罗英俊. 采油技术手册(第八分册稠油热采工程技术)[M]. 北京:石油工业出版社, 1996. WAN Renfu, LUO Yingjun. Production technical manuals(The first book of eight, technology of heavy oil thermal recovery)[M]. Beijing:Petroleum Industry Press, 1996.
|
[15] |
殷有泉, 陈朝伟, 李平恩. 套管- 水泥环- 地层应力分布的理论解[J]. 力学学报, 2006, 38(6):835-842.YIN Youquan, CHEN Chaowei, LI Ping'en. Theoretical solutions of stress distribution in casing-cement and stratum system[J].Chinese Journal of Theoretical and Applies Mechanice, 2006, 38(6):835-842.
|
[16] |
房军, 赵怀文, 岳伯谦, 等. 非均匀地应力作用下套管与水泥环的受力分析[J]. 石油大学学报(自然科学版), 1995, 19(6):52-57. FANG Jun, ZHAO Huaiwen, YUE Boqian, et al. Analysis of loading property of casing and cement sheath under non-uniform geologic stress[J]. Journal of the University of Petroleum, 1995, 19(6):52-57.
|
[17] |
YONG LI, SHUOQIONG LIU, ZHAOHUI WANG, et al. Analysis of cement sheath coupling effects of temperature and pressure in non-uniform in-situ stress field[J].SPE 131878, 2010.
|
[18] |
刘向君, 罗平亚. 岩石力学与石油工程[M]. 北京:石油工业出版社, 2004. LIU Xiangjun, LUO Pingya. Rock Mechanics and Petroleum Engineering[M]. Beijing:Petroleum Industry Press, 1996.
|
[19] |
刘健, 张林海, 陶谦, 等. 多组分油井水泥石弹性模量预测模型[J]. 钻井液与完井液, 2016, 33(2):75-78.LIU Jian, ZHANG Linhai, TAO Qian, et al. A model predicting elastic moduli of multi-component set cement[J]. Drilling Fluid & Completion Fluid, 2016, 33(2):75-78.
|
[20] |
黄海鸿, 唐世忠, 喻芬, 等. 水泥石力学变形能力的影响因素实验分析[J]. 钻井液与完井液, 2015, 32(1):73-76.HUANG Haihong, TANG Shizhong, YU Fen, et al. Experimental analysis of influencing factors on the mechanical deformation of set cement[J]. Drilling Fluid & Completion Fluid, 2015, 32(1):73-76.
|
[21] |
李敬元, 李子丰, 马兴瑞, 等. 热采井注汽管柱力学分析[J]. 工程力学, 1998, 15(3):51-60.LI Jingyuan, LI Zifeng, MA Xingrui, et al. Mechanical analysis of tubing in thermal recovery wells[J]. Engineering Mechanics, 1998, 15(3):51-60.
|
[22] |
谢仁军, 刘书杰, 吴怡, 等. 海上热采井预应力固井套管柱力学分析及可行性探讨[J]. 中国海上油气, 2015, 27(3):113-118, 125. XIE Renjun, LIU Shujie, WU Yi, et al. Study on the casing string mechanics and feasibility of pre-stressed cementing in offshore thermal recovery wells[J]. China Offshore Oil and Gas, 2015, 27(3):113-118, 125.
|
[23] |
刘坤芳, 张兆银, 孙晓明, 等. 注蒸汽井套管热应力分析及管柱强度设计[J]. 石油钻探技术, 1994, 22(4):36-40.LIU Kunfang, ZHANG Zhaoyin, SUN Xiaoming, et al. Analysis of steam-inject well casing thermal stress and casing string strength design[J]. Petroleum Drilling techniques, 1994, 22(4):36-40.
|